Recent Update

Construction Update (07/14/2017)

Posted: Friday, July 14

Nighttime double lane closures on I-84 (between I-5 and I-205) in both directions from 8 p.m. to 5:30 a.m. Monday to Friday.

Nighttime lane closures on U.S. 26 in both directions begginning at 8 p.m. Monday to Friday.

Lane closures on Murray Boulevard (between U.S. 26 and Scholls Ferry Road) and on OR 8/TV Highway (between Brookwood and OR 217) from 9 a.m. to 3 p.m. Monday to Friday.

Shoulder closures on SW 185th and Cornelius Pass Road, Murray Boulevard, Scholls Ferry Road and U.S. 26 in both directions from 9 a.m. to 3 p.m. Monday to Friday.

Periodic nighttime closures of the multi-use path along the south side of U.S. 26. (between SW 79th Avenue and SW Katherine Lane) with detours. Expect a section of path reduced to 6 feet.

MORE

East/West Regional Connections Project

The Oregon Department of Transportation and Washington County (in a partnership project) is now beginning construction of the next phase of ODOT RealTime, a system that provides real-time traffic information on roads to help travelers get where they're going more safely and efficiently. The latest project will implement ODOT RealTime between Washington County, central Portland and the Portland Airport.

This expanded system will improve road safety and help drivers make better informed decisions about their travel routes.

Learn more...

The map below contains more detailed information about upcoming paving and sign work areas. Click icons and shapes for more information.

Please note: This map will continue to be updated as the project progresses. The work schedule is subject to change based on weather and site conditions.

Know before you go! For current road conditions, visit: tripcheck.com

Older News

Construction Update (02/10/2017)

Posted: Friday, February 10

Traffic Impacts:

U.S. 26

  • Daytime shoulder closures in both directions from 9 a.m. to 3 p.m. Monday to Friday for electrical work.
  • Night work between OR 217 and the Vista Ridge Tunnel, with lane closures beginning at 8 p.m.

SW 185th

  • Daytime lane closures in both directions from 9 a.m. to 3 p.m. Monday to Friday for electrical work.

SW Cornelius Pass Road

  • Daytime lane closures in both directions from 9 a.m. to 3 p.m. Monday to Friday for electrical work.
  • Night lane closures from 7:30 p.m. to 5:30 a.m. weekdays.

OR 8

  • Night lane closures east of SW 117th Avenue and SW Broadway Street from 7:30 p.m. to 5:30 a.m. weekdays.

Multi-use path along U.S. 26

  • Periodic nighttime closures along the south side of U.S. 26., between SW 79th Avenue and SW Katherine Lane, with detours.
  • Path users should expect a section of path reduced to 6 feet.
MORE

Construction Update (02/03/2017)

Posted: Friday, February 3

Traffic Impacts:

U.S. 26

  • Daytime shoulder closures in both directions from 9 a.m. to 3 p.m. Monday to Friday for electrical work.
  • Night work between OR 217 and the Vista Ridge Tunnel, with lane closures beginning at 8 p.m.

SW 185th

  • Daytime lane closures in both directions from 9 a.m. to 3 p.m. Monday to Friday for electrical work.

SW Cornelius Pass Road

  • Weekday lane closures

Murray Boulevard

  • Weekday lane closures

OR 8

  • Night lane closures east of SW 117th Avenue and SW Broadway Street from 7:30 p.m. to 5:30 a.m. weekdays.

Multi-use path along U.S. 26

  • Periodic nighttime closures along the south side of U.S. 26., between SW 79th Avenue and SW Katherine Lane, with detours.
  • Path users should expect a section of path reduced to 6 feet.
MORE

Construction Update (01/27/2017)

Posted: Friday, January 27

Traffic Impacts:

SW 185th

  • Closures from Monday, January 30 to Friday, February 3rd
  • Daytime lane closures from 9 a.m. to 3 p.m. for electrical work.
  • Night work beginning at 8 p.m.

U.S. 26

  • Closures from Monday, January 30 to Friday, February 3rd
  • Daytime shoulder closures from 9 a.m. to 3 p.m. for electrical work.
  • Night work beginning at 8 p.m. between OR 217 and the Vista Ridge Tunnel

Multi-use Path

  • Periodic nighttime closures along the south side of U.S. 26. between SW 79th Avenue and SW Katherine Lane.
  • Path users should expect a section of path reduced to 6 feet.
MORE

Construction Update (01/20/2017)

Posted: Friday, January 20

Traffic Impacts:

SW 185th

  • Closures from Monday, January 23 to Friday, January 27th
  • Daytime lane closures from 9 a.m. to 3 p.m. for electrical work.
  • Night work beginning at 8 p.m.

U.S. 26

  • Closures from Monday, January 23 to Friday, January 27th
  • Daytime shoulder closures from 9 a.m. to 3 p.m. for electrical work.
  • Night work beginning at 8 p.m. between OR 217 and the Vista Ridge Tunnel

Multi-use Path

  • Periodic nighttime closures along the south side of U.S. 26. between SW 79th Avenue and SW Katherine Lane.
  • Path users should expect a section of path reduced to 6 feet.
MORE

Mailing List

Or, sign up for updates by regular mail.

Sign up

Connect and Share

In partnership with Washington County Logo